Pre-production

2008. Alicia Framis + Michael Lin. NOT FOR SALE (2007.10 / project rectification / technical data)

 
DESCRIPTION ASSEMBLY SYSTEM AND PROJECT’S TECHNICAL BASICS

LOGISTIC AND TECHNICAL BASICS

1. As the location is already known (LA CASA ENCENDIDA) it’s necessary to obtain maps of the building’s patio.
2. Assembly of a lighting and sound system.
3. Video camera and big scale screen. To make the pendants visible there will be a camera that, at one point, shall focus on them and project them on the screen.
4. We intend to work with children (only boys) from 4 to 17. The ideal would be children that are used to perform and work in public. The artist suggests the Real Madrid children. As the performance is on Saturday they wouldn’t have classes the next day.
5. We will need a room to use as Backstage or dressing room, for the children as for the artist that will probably close the show.
6. Alicia Framis’ crew will take care of transporting the necklaces and dressing the kids up.

TECHNICAL ELEMENTS FOR ARCHITECTURAL STRUCTURE

1. The assembly system for the architectural structure is being designed by Michel, as soon as we have the technical details we will send them to Madrid Abierto.

 (OCTOBER 2007)

 

 

 

 

 

 

 

 

08intb3543