Project

2005. Henry Eric Hernández García. ZONA VIGILADA (technical + visual data)

 

ASSEMBLY DESCRIPTION

1

Build a screen with a sound outlet between the two columns that are located in the centre of the sidewalks –just under the bridge –, route of major pedestrian traffic.

The size of the screen will be of 200cm x 450cm. I am interested in installing a screen made of strong synthetic material, attached to the columns with tubes (like scaffolding tubes).

2

Install two video-projectors, one in front of each side of the screen. One will project the images of the first space (B/W) and the other, the images of the second space (full colour).

3

4

The cameras will move on different angles of the Sculpture Museum and over the bridge, connected to a computer (placed also around the museum) and one of the video-projectors.

5

 

TECHNICAL REQUIREMENTS

- Install a screen with different sizes according to the space and the sound outlet:
- Install 2 video-projectors with accessories, one of which has to be connected to a DVD player; the other to be connected to the computer.

 

 

 

 

 

 

 

 

05prmc3440