Project

2008. Fernando Prats. GRAN SUR (technical data)

 

08PRMC1886-MD

 

 DESCRIPTION OF ASSEMBLY SYSTEM

The advert will be made of a 40cm high white neon pipe:

More or less 23 iron frames will be made, with the complete sentence in neon, therefore it will be possible to hang it from the frame and rest it against the façade of Casa de América.

 

THE DRAFT’S TECHNICAL NEEDS

Technical crew specialized in assembly and disassembly of promotional neon pipes. Electrical current to light the advert.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08prmc1886, 08prtc3523